Clean Construction / Basement Makeovers / Elyria, Ohio
Basement makeovers for Elyria homes — moisture handled before drywall ever goes up, egress done to code, and one crew from framing to final trim. Owner on site.
Elyria's housing stock runs old, and old basements have long memories — block and stone foundations, decades of grading changes, and that damp smell that tells you someone finished a basement here once before without asking why the wall was wet. Brad's rule for every Elyria basement is the same: the water gets solved before the room gets built. Moisture assessment first, then design.
Once the basement is dry and staying that way, the makeover is where these houses win big. Elyria basements tend to be full footprints — real square footage that becomes a family room, a home office, a gym, a guest suite. Brad frames, insulates with materials that belong below grade (foam, not bare fiberglass against block), and builds around your mechanicals so the furnace stays serviceable instead of drywalled into a coffin.
If a bedroom is part of the plan, an egress window is part of the code — a legal escape opening cut and flashed into the foundation, which Brad handles as part of the job. Permits for finishing work, electrical, and plumbing run through the City of Elyria Building Department, and the inspections that come with them are your protection, not your problem.
Around Elyria, finishing a basement without solving its moisture is just installing expensive mold food. Brad assesses how your foundation, grading, and sump actually handle water — and fixes what needs fixing — before a single stud goes up.
Bare fiberglass against block walls is how basements grow that smell. Brad builds with below-grade-rated foam insulation, moisture-tolerant flooring, and assemblies that can dry — so the finished room stays a room instead of becoming a science experiment.
A below-grade bedroom legally requires an egress window — a real escape opening cut and flashed into the foundation. Brad builds it into the plan from day one, along with the smoke/CO, outlet, and stair details the Residential Code of Ohio expects.
Your furnace, water heater, panel, and sump all live down there, and they'll all need attention someday. Brad frames access into the design — doors, panels, clearances — so the finished basement never has to be opened up with a drywall saw. Permits run through the City of Elyria Building Department.
The finish carpentry shown here — millwork, trim, countertops — is the same work that goes into Clean Construction basement bars and built-ins. More in the full portfolio.
Family room, guest suite, bar, gym, office — or "all of it, somehow." Rough ideas are fine. If you know the basement has a damp history, say so up front; it changes nothing about whether Brad will take the job and everything about how he plans it.
Moisture evidence, ceiling heights, mechanical locations, where the sump discharges, where an egress window could go. This is where the honest constraints surface — and where the plan starts fitting your actual house in Elyria, not a Pinterest board.
Layout, finishes, and a line-by-line number — framing, insulation, electrical, plumbing, drywall, flooring, trim. Nothing buried. Money is settled in the contract before anything starts.
Permits pulled, rough-ins inspected, insulation and drywall in, floors and doors and trim down, punch list closed. Brad is on site through it. Most basements run four to eight weeks depending on scope — you get the schedule before work starts.
Yes — finishing a basement is real construction: framing, electrical, usually plumbing and HVAC changes, each with its own permit and inspections through the City of Elyria Building Department. Brad handles the drawings, applications, and every inspection. Unpermitted basement finishes are a classic problem at resale; yours won't be one.
Yes. The Residential Code of Ohio requires any below-grade sleeping room to have an emergency escape opening — in practice, an egress window cut into the foundation with a code-sized well. Brad cuts, flashes, and finishes egress windows as part of the job, and they have the side benefit of real daylight.
Usually, yes. If your home has a rough-in under the slab, it's the natural spot and saves real money. Without one, the options are slab cutting to reach the drain line or an up-flushing system — both legitimate, each with trade-offs Brad will lay out plainly, along with what your specific house makes practical.
Most run four to eight weeks of build time depending on scope — a straightforward family room lands at the short end; a suite with a bathroom and egress window at the long end. Rough-in inspections set the rhythm. You get a schedule before work starts, and Brad tells you the same day when something moves it.
Scope drives it — square footage, bathroom or not, egress, and finish level — so Brad doesn't quote blind. He walks the basement, then you get a written, itemized estimate with every line explained. The walkthrough and the estimate cost you nothing.
Usually yes — after the dampness is diagnosed and fixed, not hidden. Spring damp in Elyria is typically grading, gutters, or hydrostatic pressure, each with a real fix: regrade, redirect, or interior drainage to a sump. Brad determines which one your basement actually has before designing the finish, because drywall over a moisture problem is just expensive mold food.
Fill this out or call him directly. Either way you're talking to the person who builds it.
Brad will call you back the same day. If it's urgent, call him directly at 440-315-4438.